Fluid flow path device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11927403
SERIAL NO

17601902

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fluid flow channel device includes a main body and a non-ceramic sub-body. The main body has a plurality of internal flow channels, and inlets and outlets thereof are arranged so as to be exposed on an outer side surface. The sub-body has a fluid supply path and a fluid recovery path. A supply port of the fluid supply path is arranged to face the inlets of the plurality of internal flow channels. A recovery port of the fluid recovery path is arranged to face the outlets of the plurality of internal flow channels. By disposing the supply port and the recovery port for transferring the fluid to and from the plurality of internal flow channels in the sub-body, it is possible to prevent a large thermal stress from being applied to the main body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOBELCO ECO-SOLUTIONS CO LTD4-78 WAKINOHAMA-CHO 1-CHOME CHUO-KU HYOGO KOBE-SHI 6510072

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ichihashi, Nobumasa Takasago, JP 3 1
Noishiki, Koji Takasago, JP 62 200
Ozono, Tomohiro Takasago, JP 7 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00