Agricultural implement frame assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11927304
APP PUB NO 20190246546A1
SERIAL NO

16271477

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An agricultural implement is configured to be advanced in a forward direction and includes an implement frame. The implement frame includes a pair of laterally extending fore-and-aft spaced frame members. The frame also includes a fore-and-aft extending interconnecting member that extends between the frame members and presents forward and aft ends. At least one of the frame members comprises a tubular beam presenting forward and aft walls. The forward and aft walls at least partly define an interior beam space, with a window opening being defined in a first one of the walls. The tubular beam receives a respective end of the interconnecting member so that the interconnecting member extends into and out of the interior beam space through the window opening. The respective end of the interconnecting member is welded to a second one of the walls.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MORRIS EQUIPMENT LTD3607 E CUMBERLAND ROAD REGINA S4V 3C4

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gordon, Jeffrey Jonathan Yorkton, CA 1 2
Sheppard, Clint W Yorkton, CA 18 166

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00