Brake device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11926298
APP PUB NO 20230174027A1
SERIAL NO

17989990

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A brake device includes a brake pedal, an input rod, a master cylinder, a guide rail, a slider, and a coupling arm. The brake pedal is rotatable using an arm rotary shaft disposed on one end of a pedal arm used as a fulcrum. A pedal force input to the brake pedal is transmitted to the input rod as a thrust. The master cylinder is configured to generate a brake hydraulic pressure responsive to the thrust input to the input rod. The guide rail is disposed on the pedal arm and extends along a longitudinal direction of the pedal arm. The slider is coupled to the pedal arm via the guide rail and is movable on the guide rail. The coupling arm has a first end rotatably coupled to the slider and a second end rotatably coupled to the input rod. The second end is different from the first end.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUBARU CORPORATION1-20-8 EBISU SHIBUYA-KU TOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Imaizumi, Tomonori Tokyo, JP 2 0
Kondo, Yujiro Tokyo, JP 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00