Prefabricated electrical modules and system with fabrication and construction methods

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11923665
SERIAL NO

17499647

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Prefabricated electrical modules and system along with fabrication and construction methods are provided. The prefabricated electrical system includes multiple framed, prefabricated electrical modules of one or more types. The prefabricated electrical module disclosed may comprise one or more of a main service electrical module, a low-voltage module, a switch component module, and a receptacle component module. The casing of the interior components of the modules is weatherproofed and/or weatherized. Each of the modules includes a module exterior frame that accommodates the specialized elements of that particular module. Methods for fabrication of the modules are disclosed. Construction methods for installing the assemblies are also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RODNICK LLC8850 TERABYTE CT STE B RENO NV 89521

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bartholomew, Nicholas Reno, US 7 0
McKimmey, Rodney Lee Reno, US 6 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00