Catalyst layer for fuel cell, and fuel cell

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11923550
APP PUB NO 20210075024A1
SERIAL NO

16957450

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The preset disclosure provides a catalyst layer that has a small contact resistance with a gas diffusion layer and excellent gas diffusion properties. The catalyst layer for a fuel cell has a uniform thickness and includes fibrous conductive members and catalyst particles. The fibrous conductive members are inclined relative to a surface direction of the catalyst layer, and a lengthwise direction of the fibrous conductive members, on average, matches a first direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD1-61 SHIROMI 2-CHOME CHUO-KU OSAKA-SHI OSAKA 5406207 ?5406207

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Imura, Shinichiro Hyogo, JP 34 63
Ishimoto, Hitoshi Hyogo, JP 29 92
Minamiura, Takeshi Osaka, JP 28 226
Shimasaki, Yukihiro Hyogo, JP 51 328
Yamasaki, Kazuya Osaka, JP 22 116

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00