Quantum dot devices with side and center screening gates

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11922274
SERIAL NO

17323487

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Quantum dot devices with three of more accumulation gates provided over a single row of a quantum dot formation region are disclosed. Each accumulation gate is electrically coupled to a respective doped region. In this manner, multiple single electron transistors (SETs) are provided along the row. Side and/or center screening gates may be used to apply microwave pulses for qubit control and to control electrostatics so that source and drain regions of the multiple SETs with quantum dots formed along the single row of a quantum dot formation region are sufficiently isolated from one another. Such quantum dot devices provide strong spatial localization of the quantum dots, good control over quantum dot interactions and manipulation, good scalability in the number of quantum dots included in the device, and/or design flexibility in making electrical connections to the quantum dot devices to integrate the quantum dot devices in larger computing devices.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTEL CORPORATION2200 MISSION COLLEGE BLVD SANTA CLARA CA 95054

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bojarski, Stephanie A Beaverton, US 21 134
Clarke, James S Portland, US 139 3051
George, Hubert C Portland, US 72 1576
Henry, Eric M Forest Grove, US 3 12
Kotlyar, Roza Portland, US 55 855
Lampert, Lester Portland, US 39 639
Mueller, Brennen Karl Portland, US 6 1
Neyens, Samuel Frederick Portland, US 1 0
Pillarisetty, Ravi Portland, US 452 8118
Watson, Thomas Francis Portland, US 8 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00