System and method for burning gas emitted from an instrument

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11920787
APP PUB NO 20200256561A1
SERIAL NO

16753476

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present subject matter provides a burner configured to burn a gas released from an instrument, for example a gas chromatography instrument, the burner comprising: a burning chamber; a gas inlet, configured to allow entry of the gas from the instrument into the burning chamber; an oxygen mix inlet, configured to allow entry of an oxygen mix into the burning chamber; a flammable gas inlet, configured to allow entry of a flammable gas into the burning chamber, and an igniter, capable of igniting gases in the burning chamber. A system for controlling the burning of a gas emitted from an instrument, a method for burning a gas emitted from an instrument, and a method for using a flammable gas as a carrier gas in a gas chromatography instrument, are also provided, as well as various embodiments thereof.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MERY REUVEN28065 KIRYAT ATA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Mery, Reuven Kiryat Ata, IL 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00