Composite plated product and method for producing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11920255
APP PUB NO 20220259753A1
SERIAL NO

17630564

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There are provided a composite plated product wherein a composite plating film of a composite material containing carbon particles in a silver layer is formed on a base material and wherein the amount of the carbon particles dropped out of the composite plating film is small, and a method for producing the same. After a composite plating film of a composite material containing carbon particles in a silver layer is formed on a base material (of preferably copper or a copper alloy) by electroplating using a silver-plating solution to which the carbon particles are added, a treatment for removing part of the carbon particles on the surface thereof is carried out.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOWA METALTECH CO LTDTOKYO JAPAN TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Doi, Tatsuhiro Tokyo, JP 6 5
Kato, Yukiya Tokyo, JP 10 22
Kotani, Hirotaka Tokyo, JP 12 22
Narieda, Hiroto Tokyo, JP 29 84
Tomiya, Takao Tokyo, JP 6 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00