Method for manufacturing processed cork chip and method for constructing floor using same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11920038
APP PUB NO 20210163747A1
SERIAL NO

16770586

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method for manufacturing processed cork chips, and a floor construction method using the same. The processed cork chips are manufactured by the method, including: crushing and drying cork chips; adding polyurea to the dried cork chips to prepare a mixture; heating the mixture to cure the same; and cooling the cured mixture. Further, the floor construction method includes: laying the processed cork chips on the surface of a floor formed of concrete, a water-permeable base layer or crushed stone with a solidified top surface; and flattening the processed cork chips and pressing the same by means of a roller at a fixed temperature.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
A-ROAD CO31 SONGHAKJEONG-RO BUKBANG-MYEON HONGCHEON-GUN GANGWON-DO 25115

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
So, Nam Woo Seoul, KR 2 8
So, Sung Hwan Seoul, KR 32 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00