Method for enhancing compressive strength of lead smelting water-quenched slag-based cementitious material by mechanical activation

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11919826
SERIAL NO

18320573

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for enhancing compressive strength of a lead smelting water-quenched slag-based cementitious material by mechanical activation is provided, belonging to the technical field of solid waste resource treatment. The method includes following steps: grinding and activating water-quenched slag from lead smelting, then mixing with calcium-based solid waste, magnesium-based solid waste, magnesium oxide, portland cement and water, and performing a steam curing and a curing at normal temperature on cementitious material slurry obtained to obtain the lead smelting water-quenched slag-based cementitious material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XI'AN UNIVERSITY OF ARCHITECTURE AND TECHNOLOGYNO 13 YANTA ROAD XI'AN CITY SHAANXI 710055

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Du, Renhao Xi'an, CN 1 0
Jiang, Yiwen Xi'an, CN 3 1
Li, Hui Xi'an, CN 1361 15841
Liu, Wenhuan Xi'an, CN 1 0
Wan, Yongfeng Xi'an, CN 1 0
Zhao, Zhongzhong Xi'an, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00