Bamboo chip integrated material and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11919192
APP PUB NO 20210060815A1
SERIAL NO

17043696

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention discloses a bamboo chip integrated material. The bamboo chip integrated material is formed by a plurality of lengthened bamboo chips which are glued and overlaid; each lengthened bamboo chip is formed by a plurality of bamboo chip units which sequentially and continuously mesh and are butted; sharp teeth and grooves are formed in the two ends in the length direction of the bamboo chip units, wherein the sharp tooth of each bamboo chip unit and the groove of the corresponding bamboo sheet unit are matched to form a meshing butt-joint part, and the meshing butt-joint parts of the adjacent lengthened bamboo chips are arranged in a staggered mode; and each bamboo chip unit has a thickness of 4-12 mm and a width of 15-50 mm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HUNAN TAOHUAJIANG BAMBOO SCIENCE & TECHNOLOGY CO LTDTAOJIANG DEVELOPMENT ZONE TAOJIANG COUNTY YIYANG HUNAN 413400 CHINA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hu, Jinbo Hunan, CN 22 40
Hu, Yuankun Hunan, CN 1 0
Hu, Zhibin Hunan, CN 3 9
Li, Ting Hunan, CN 218 986
Wu, Zhiping Hunan, CN 5 6
Xiong, Yanhui Hunan, CN 5 0
Xue, Zhicheng Hunan, CN 13 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00