Sheet assemblies having a plurality of adjustable straps

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11918526
SERIAL NO

17405456

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A sheet assembly includes a sheet having an edge and a pocket extending longitudinally along the edge. A plurality of loops are arranged along the edge and extend from openings formed in the pocket of the sheet. An adjustment webbing is slidably positioned within the pocket. At least a portion of each loop of the plurality of loops is anchored to the adjustment webbing such that sliding the adjustment webbing along the pocket pulls the plurality of loops into the pocket and reduces an exposed length of the plurality of loops.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LIKO RESEARCH & DEVELOPMENT AB975 92 LULEÅ

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Buccieri, Michael Greenfield, US 19 214
Conejo, Castaño Alejandro Noe Batesville, US 10 7
Dovervik, Elin Luleå, SE 11 55
Slavin, Jennifer Domina Batesville, US 2 0
Turner, Jonathan D Dillsboro, US 116 3064

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 5, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 5, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 5, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00