DDR phy parallel clock paths architecture

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11916558
SERIAL NO

18080728

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for clock switching includes propagating a first clock signal through a first clock path, propagating a second clock signal through a second clock path, generating a first delay control signal based on the first clock signal, and generating a second delay control signal based on the second clock signal. The method also includes, in a first mode, coupling the first clock path to a delay circuit and inputting the first delay control signal to a control input of the delay circuit. The method also includes, in a second mode, coupling the second clock path to the delay circuit and inputting the second delay control signal to the control input of the delay circuit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
QUALCOMM INCORPORATED5775 MOREHOUSE DRIVE SAN DIEGO CA 92121-1714

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Andreev, Boris Dimitrov San Diego, US 10 32
Hinrichs, Jeffrey Mark San Diego, US 22 151
Li, Yuxin San Diego, US 19 273
Mahendiyan, Vikas San Diego, US 4 0
Meruva, Anand San Diego, US 6 7
Xu, Yong San Diego, US 250 1527

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 27, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00