Natural gas liquefaction installation arranged at the surface of an expanse of water, and associated cooling method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11913715
SERIAL NO

16494222

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The installation (10) comprises: —at least one air-cooled heat exchanger (22), the air-cooled heat exchanger (22) comprising a tube bundle capable of accepting a flow (24) that is to be cooled, and a fan capable of causing a flow of air to circulate across the bundle of tubes; —a water spraying assembly (26). The desalination assembly (20) comprises a salt water pickup (100) in the expanse of water (12), the desalination assembly (20) being coupled downstream to the water-spraying assembly (26). The water spraying assembly (26) comprises at least one spray nozzle opening into the bundle of tubes, the or each spray nozzle being directed towards the tubes of the tube bundle so as to spray liquid demineralised water coming from the desalination assembly (20) into contact with the tubes of the tube bundle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TECHNIP FRANCE92400 COURBEVOIE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Berthelot, Pierre Paris, FR 3 5
Hagyard, Philip Paris, FR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 27, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00