Press frame assembly

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11911989
SERIAL NO

17420932

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A press frame assembly includes a base plate, a load cell, and an overload protection element; a first plate, a plurality of guideposts disposed on the base plate; a plurality of springs disposed on the plurality of guideposts, a displacement transducer arranged to monitor a linear displacement of the first plate, and a controller, in communication with the load cell and the displacement transducer. The first plate is disposed to translate on the plurality of guideposts, and wherein the springs are disposed to urge movement of the first plate in relation to the base plate. The load cell is arranged to monitor a load exerted upon the base plate. The controller generates a signal that is based upon the load exerted upon the base plate or the linear displacement of the first plate in relation to the base plate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PROMESS INC11429 GRAND RIVER ROAD BRIGHTON MI 48116

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Joseph, Andrew H Milford, US 5 3
Nausley,, Jr Glenn W Howell, US 4 0
Paul, Cole D Novi, US 1 0
Rall, Matthew R Howell, US 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 27, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00