Applying corrosion inhibitor within tubulars

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11911790
APP PUB NO 20230271220A1
SERIAL NO

17681261

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A central tubular defines a central flow passage and spray nozzles along an outer circumference of the central tubular. A first brush pig supports a first end of the central tubular. A second brush pig supports a second end of the tubular. An inflatable balloon is at the second end of the tubular. The inflatable balloon is encircled by the second brush pig. The inflatable balloon is configured to cause a first pressure drop across the balloon when in an inflated state and cause a second pressure drop, less than the first pressure drop, across the balloon when in a deflated state. A flow control system is at the first end of the tubular and is configured to regulate fluid exchange with the tubular and fluid exchange with the inflatable balloon.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANY1 EASTERN AVENUE DHAHRAN 31311

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Al, Hennawi Qais Mohammad Hashemite, JO 4 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 27, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00