Method for manufacturing water absorption treatment material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11911746
APP PUB NO 20210039071A1
SERIAL NO

17083406

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing a water absorption treatment material made of a plurality of grains includes a preparing step, a pulverizing step, a core portion forming step, and a coating portion forming step. The preparing step is a step of preparing a paper powder to which water-absorbent polymers adhere, the paper powder being derived from a sanitary product. The pulverizing step is a step of pulverizing remaining polymers using a pulverizer. The core portion forming step is a step of forming a core portion constituting each of the grains The coating portion forming step is a step of forming a coating portion so as to cover the core portion, the coating portion containing the paper powder, and the remaining polymers pulverized in the pulverizing step. In the pulverizing step, the remaining polymers left in a state of adhering to the paper powder are subjected to the pulverizer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DAIKI CO LTD4-4-11 AKASAKA MINATO-KU TOKYO 1070052

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yoshinaga, Junji Tokyo, JP 71 87

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 27, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00