Process for preparing a seed support

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11910739
SERIAL NO

17594011

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention provides a process for the preparation of a seed support that comprises a biodegradable polymer film having a plurality of seeds at least partially embedded therein, the process comprising the steps of

    (a) providing a hydrophobic release liner (18);(b) applying a coating of an aqueous dispersion or solution comprising a biodegradable polymer on the hydrophobic release liner (18), wherein the dispersion or solution has a viscosity of from 2000 to 16000 mPa·s and a water content of from 58% to 90% by weight of the coating;(c) depositing a plurality of seeds onto the coating so that the seeds become at least partially embedded in the coating;(d) drying the coating to give a final water content of 1.5% to 15% by weight and thereby form the biodegradable polymer film; and(e) detaching the hydrophobic release liner from the biodegradable polymer film to give the seed support.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
S+DB B V6004 HT WEERT

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lub, Franciscus Johannes Weert, NL 1 0
Otten, Gerard Lodewijk Weert, NL 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 27, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 27, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 27, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00