Switching regulator and controller circuit and control method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11909315
APP PUB NO 20220231604A1
SERIAL NO

17567129

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A switching regulator includes a power stage circuit and a controller circuit. The controller circuit includes a first amplification circuit, a second amplification circuit, a ramp signal generation circuit, and a comparator. The first amplification circuit generates an amplification signal according to a difference between a low-pass filtered signal and a feedback signal. The second amplification circuit generates an adjustment signal according to a difference between the feedback signal and a fast response signal. The comparator generates a pulse width modulation signal according to a difference between the amplification signal and a ramp signal to generate a switch control signal. The adjustment signal adaptively adjusts the amplification signal or the ramp signal. The low-pass filtered signal is related to a signal generated by filtering out higher frequency part of the reference signal, and the reference signal is related to a dynamic change of a target level of the output voltage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RICHTEK TECHNOLOGY CORPORATION302 CHUPEI CITY HSINCHU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chuang, Yung-Chun Taipei, TW 21 31
Yang, Huan-Chien New Taipei, TW 15 129

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 20, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00