Heat pump refrigerant loop arrangements

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11906213
APP PUB NO 20220412611A1
SERIAL NO

17357137

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A heat pump includes a refrigerant loop. The refrigerant loop includes a compressor, a first condenser, a vapor generator having a first region and a second region, a first expansion valve, a second expansion valve, and a first evaporator. A branching point is positioned between the first condenser and the vapor generator. The branching point diverts a portion of a first heat exchange fluid circulating through the refrigerant loop to the vapor generator. The first expansion valve is positioned between the branching point and the vapor generator. An outlet vapor generator is coupled to a mid-pressure inlet port of the compressor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORD GLOBAL TECHNOLOGIES LLC1 AMERICAN RD FL4 DEARBORN MI 48126-2701

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brown, Jeffrey Paul Farmington Hills, US 23 153
Koberstein, Manfred Troy, US 96 586
Lohmeyer, Loren John Monroe, US 12 53
Shey, Rachael Clawson, US 14 79

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 20, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00