Low emissions well pad with integrated enhanced oil recovery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11905805
SERIAL NO

17525901

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods involve capturing gaseous and liquid byproducts from the recovery of hydrocarbons and then using those captured byproducts for commercially and environmentally advantageous purposes. A method for recovering hydrocarbons from a well includes the steps of placing the well in a first mode of operation in which gases from the well are stored under pressure in a gas storage unit on the surface, and placing the well in a second mode of operation in which gases are transferred from the gas storage unit into an underground gas storage formation through the well. Methods for managing produced water include the steps of storing the produced water in an underground water storage reservoir, heating the produced water with geothermal energy, and transferring the heated water to an energy recovery system to generate electricity from the heated produced water.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAKER HUGHES OILFIELD OPERATIONS LLC17021 ALDINE WESTFIELD HOUSTON TX 77073

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Joshi, Mahendra Katy, US 33 130
Klenner, Rob Oklahoma City, US 1 0
Shahkarami, Alireza Oklahoma City, US 6 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 20, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00