Method and arrangement for supporting a first beam between a first and a second support structure in a building frame structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11905699
SERIAL NO

17298701

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and an arrangement for supporting a first beam between a first support structure and a second support structure in a building frame structure. The method includes securing the first beam to a first console against movement along the first console by means of a mechanical joint between the first console and the first beam, and the first console at a location between the beam supporting surface of the first console and the mechanical joint with a deforming section having increased deformability compared to the deformability of the first console at the beam supporting surface by reduced material dimensions in said deforming section of the first console compared to the material dimensions of the first console at the beam supporting surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PEIKKO GROUP OY15170 LAHTI

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Soivio, Jaakko Lahti, FI 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 20, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00