Graphene oxide material, halogenated graphene material, preparation methods therefor, and electrolysis system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11905605
APP PUB NO 20230002916A1
SERIAL NO

17756240

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a graphene oxide material, a halogenated graphene material, preparation methods therefor, and an electrolysis system. A method for producing a graphene oxide material in an electrolysis system comprises the following steps: applying a voltage between a working electrode and a counter electrode, and exfoliating graphite and/or amorphous carbon under the action of electrolysis so as to generate the graphene oxide material, wherein before applying the voltage and/or in the process of applying the voltage, light irradiation is performed on the electrolysis system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XIAMEN UNIVERSITYXIAMEN CITY FUJIAN PROVINCE 361005 SOUTH SIMING ROAD NO 422 XIAMEN CITY FUJIAN PROVINCE 361005

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Duhong Fujian, CN 1 0
Tian, Zhongqun Fujian, CN 3 4
Zhan, Dongping Fujian, CN 2 4
Zhang, Binbin Fujian, CN 18 164

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 20, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 20, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 20, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00