Virtual and parallel power extraction method by using time division

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11903110
SERIAL NO

17695841

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A virtual and parallel power extraction method by using time division, comprising an alternating current load (1), a load end time-division power extraction control device (2), a switch end time-division power extraction control device (3), and a switch end power supply load (4). The alternating current load (1) is connected in parallel with the load end time-division power extraction control device (2); the switch end time-division power extraction control device (3) is connected in parallel with the switch end power supply load (4); a combination body formed by connecting the alternating current load (1) with the load end time-division power extraction control device (2) in parallel and the combination body formed by connecting the switch end time-division power extraction control device (3) with the switch end power supply load (4) in parallel are together connected in series in an alternating current circuit. The present invention provides an efficient power extraction method between an electronic switch and a connected load on the premise of having no a neutral line, and particularly solves the problem that the electronic switch is falsely turned off or incompletely turned off for a low-power LED lamp.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HUIZHOU HAOMEISHI INTELLIGENT TECHNOLOGY CO LTD516000 FIRST FLOOR OF SHANGLIE STREET SHANGXIANG BUILDING SANDONG TOWN HUICHENG DISTRICT HUIZHOU CITY GUANGDONG PROVINCE HUIZHOU CITY GUANGDONG PROVINCE 516000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Hui Shenzhen, CN 1361 15841
Li, Wenfan Shenzhen, CN 2 2
Zhao, Long Shenzhen, CN 81 123

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 13, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00