Waveguide assembly comprising first and second waveguide portions joined together through a gap interface and communication system formed therefrom

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11901599
SERIAL NO

17826040

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one embodiment, a waveguide assembly includes a first waveguide portion having a first end, a second end, and a first waveguide channel extending between the first end and the second end, and a second waveguide portion having a first end, a second end, and a second waveguide channel extending between the first end and the second end, wherein the first waveguide portion and the second waveguide portion are configured to connect such that the first waveguide channel and the second waveguide channel form a combined channel, wherein the combined channel includes a gap interface between the first waveguide channel and the second waveguide channel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SPACE EXPLORATION TECHNOLOGIES CORP1 ROCKET ROAD HAWTHORNE CA 90250

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Giglio, Robert D Seattle, US 1 0
Jensen, Anders Beaux Arts, US 44 249
Reineman, Samuel T Kirkland, US 6 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 13, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00