Dielectric composition and multilayer capacitor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11901127
SERIAL NO

17474510

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A dielectric composition and a multilayer capacitor including the same are provided. The dielectric composition includes a BaTiO3-base main component, a first subcomponent including an Nb component and a Gd component, a second subcomponent including an Mg component, and a third subcomponent including a Ba component and a Ca component. The first subcomponent is included in an amount of 4 moles or less per 100 moles of the main component. In the first subcomponent, a molar content of Nb and a molar content of Gd satisfy 0.33≤Nb/Gd, and in the third subcomponent, a molar content of Ba and a molar content of Ca satisfy 0.2≤Ca/(Ba+Ca).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRO-MECHANICS CO LTDMAEYOUNG-RO 150 (MAETAN-DONG) YOUNGTONG-GU SUWON-SI GYEONGGI-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Hyoung Uk Suwon-si, KR 26 62
Kim, Jong Han Suwon-si, KR 123 895
Lee, Chung Eun Suwon-si, KR 21 145
Park, Jae Sung Suwon-si, KR 92 362
Park, Jeong Yun Suwon-si, KR 7 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 13, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00