PTO lubrication system for hybrid vehicles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11898629
APP PUB NO 20230279943A1
SERIAL NO

18118538

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle drive system includes a first prime mover, a transmission, a power take-off (PTO), a lubrication system for the transmission and the PTO, and a control system. The transmission is powered by the first prime mover. The transmission is configured to rotate a drive shaft of the vehicle. The PTO is connected to the transmission at a first interface. The PTO includes the first interface and a second interface. The control system is configured to control fluid flow through the lubrication system for at least one mode where the input section of the PTO is stationary and the output section rotates.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
POWER TECHNOLOGY HOLDINGS LLCW237 N2878 WOODGATE ROAD SUITE 2 PEWAUKEE WI 53072

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dalum, Joseph T Pewaukee, US 9 155
Mammen,, Jr William C Oconomowoc, US 4 6
Vanselow, Aaron Scott Kim Brookfield, US 4 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 13, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00