Composite turbine disc rotor for turbomachine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11897065
APP PUB NO 20210140318A1
SERIAL NO

16777343

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rotor for a turbomachine and a method of manufacturing the same. The method includes providing a lug with a lug body and an interface material disposed on the lug body. The method also includes friction welding the lug to a hub member via the interface material to define a projected structure for an outer radial area of a disc assembly of the rotor. The projected structure is configured to support a first side of a rotor blade of the rotor in cooperation with a second projected structure of the disc assembly supporting a second side of the rotor blade. The lug body and the hub member are made from different materials.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HONEYWELL INTERNATIONAL INC101 COLUMBIA ROAD P O BOX 2245 MORRISTOWN NJ 07962-2245

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harman, Stuart Peoria, US 2 8
Kurlak, Paul Scottsdale, US 6 39
Legzdina, Daira Phoenix, US 4 37
Morris, Mark Phoenix, US 52 158
Smoke, Jason Phoenix, US 49 421

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 13, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00