Method for implementing radar-communication integration of vehicle, related device, and system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11892554
APP PUB NO 20210003661A1
SERIAL NO

17026884

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for implementing radar-communication integration of a vehicle, where the method includes obtaining, by a radar device of a first vehicle, a first communication message, modulating the first communication message into a first carrier signal, where an operating frequency of the first carrier signal is in an operating band of the radar device, sending a periodic radar signal, and sending the first carrier signal to a second vehicle within a time gap between sending of a radar signal in a current period and sending of a radar signal in a next period.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHENZHEN YINWANG INTELLIGENT TECHNOLOGIES CO LTDROOM 101 HUAWEI HEADQUARTERS OFFICE BUILDING HUAWEI VANKE CITY COMMUNITY BANTIAN STREET LONGGANG DISTRICT SHENZHEN 518129

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Peng, Xueming Shanghai, CN 11 28
Xu, Shaofeng Xi'an, CN 10 21
Zhai, Botao Xi'an, CN 1 1
Zhang, Zhiwei Shanghai, CN 104 784

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 6, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00