Power system and associated system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11890968
APP PUB NO 20210188097A1
SERIAL NO

17197517

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power system is disclosed. The power system includes a first power generating unit. The first power generating unit includes a first power converting subunit and a first control unit coupled to the first power converting subunit, where the first control unit is configured to regulate a voltage of the first power generating unit. The power system further includes a second power generating unit coupled to the first power generating unit and a load, where the second power generating unit includes a second power converting subunit and a second control unit coupled to the second power converting subunit, wherein the second control unit is configured to control a current of the second power generating unit to share a quantity of electrical output current flowing through the load among the first and second power generating units.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TRANSPORTATION IP HOLDINGS LLC901 MAIN AVENUE NORWALK CT 06851

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ali, Shahid Bangalore, IN 39 232
Chennamsetty, Prashanth Manikumar Bangalore, IN 10 33
Ganireddy, Govardhan Roanoke, US 61 245
Kumar, Ajith Kuttannair Erie, US 425 8886

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 6, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 6, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 6, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00