Method of operating a nuclear power plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11875906
APP PUB NO 20230111998A1
SERIAL NO

17950830

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present relates to the integration of the primary functional elements of graphite moderator and reactor vessel and/or primary heat exchangers and/or control rods into an integral molten salt nuclear reactor (IMSR). Once the design life of the IMSR is reached, for example, in the range of 3 to 10 years, it is disconnected, removed and replaced as a unit. The spent IMSR functions as the medium or long term storage of the radioactive graphite and/or heat exchangers and/or control rods and/or fuel salt contained in the vessel of the IMSR. The present also relates to a nuclear reactor that has a buffer salt surrounding the nuclear vessel. During normal operation of the nuclear reactor, the nuclear reactor operates at a temperature that is lower than the melting point of the buffer salt and the buffer salt acts as a thermal insulator. Upon loss of external cooling, the temperature of the nuclear reactor increases and melts the buffer salt, which can then transfer heat from the nuclear core to a cooled containment vessel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TERRESTRIAL ENERGY INCMISSISSAUGA ON L4W 5K4

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Leblanc, David Ottawa, CA 31 682

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 16, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 16, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 16, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00