Integrated multilayer actuators

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11871674
SERIAL NO

16594348

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multilayer actuator includes a primary electrode, a secondary electrode overlapping at least a portion of the primary electrode, and an electroactive layer disposed between and abutting the primary electrode and the secondary electrode. The multilayer actuator further includes a primary antireflective coating overlapping at least a portion of the primary electrode opposite the electroactive layer, a secondary antireflective coating overlapping at least a portion of the secondary electrode opposite the electroactive layer, and a barrier layer overlapping the secondary antireflective coating opposite the secondary electrode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
META PLATFORMS TECHNOLOGIES LLC1601 WILLOW ROAD MENLO PARK CA 94025

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Delparastan, Amir Peyman Redmond, US 1 0
Ouderkirk, Andrew John Redmond, US 310 1186
Smyth, Katherine Marie Seattle, US 66 442
Wells, Spencer Alan Seattle, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 9, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00