Method of manufacturing a power transmission device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11867283
APP PUB NO 20220381335A1
SERIAL NO

17657488

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure is directed to a method of manufacturing a power transmission device that can include forging to form a planetary carrier plate integrated with dog teeth, sintering to form a planetary carrier, and joining the planetary carrier plate to the planetary carrier by brazing the planetary carrier plate to the planetary carrier at support parts arranged in a circumferential direction at a peripheral edge part of the planetary carrier so that the planetary carrier plate is fixed to face the planetary carrier on a side of the planetary carrier where a pinion gear is positioned. The method can further include sintering the planetary carrier plate and the planetary carrier, forming a pinion shaft hole for mounting a pinion shaft that constitutes the pinion gear in the planetary carrier plate and the planetary carrier, and performing high-frequency quenching on the dog teeth of the planetary carrier plate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hatsuyama, Hiroaki Toyota, JP 5 0
Hayashi, Koki Toyota, JP 27 237

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 9, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00