Main stream reservoir ecological modulation method considering incoming water from interval tributaries
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Jan 9, 2024
Grant Date -
Oct 26, 2023
app pub date -
Apr 29, 2021
filing date -
May 27, 2020
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A main stream reservoir ecological modulation method considering incoming water from interval tributaries is provided. The method determines the contribution ratio of the incoming water from interval tributaries to first-day's water rising in a high-flow surge process and when to start ecological modulations of spawning ground sections, determines a river course routing method after a main stream and its tributaries joining and calibrating parameters, based on past hydrological data, performing river flow calculation on the discharge volume of upstream reservoirs and the flow after interval tributaries joining, and determines a main stream reservoir ecological modulation mode considering incoming water from interval tributaries.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
CHINA THREE GORGES CORPORATION | NO 1 LIUHE ROAD JIANG'AN DISTRICT WUHAN HUBEI 430014 430014 | |
CHANGJIANG RIVER SCIENTIFIC RESEARCH INSTITUTE | HUBEI |
International Classification(s)

- 2021 Application Filing Year
- E02B Class
- 178 Applications Filed
- 102 Patents Issued To-Date
- 57.31 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Dai, Huichao | Beijing, CN | 11 | 0 |
# of filed Patents : 11 Total Citations : 0 | |||
Jiang, Dingguo | Beijing, CN | 4 | 0 |
# of filed Patents : 4 Total Citations : 0 | |||
Li, Qingqing | Hubei, CN | 12 | 159 |
# of filed Patents : 12 Total Citations : 159 | |||
Liu, Zhiwu | Beijing, CN | 7 | 17 |
# of filed Patents : 7 Total Citations : 17 | |||
Xu, Jijun | Hubei, CN | 5 | 3 |
# of filed Patents : 5 Total Citations : 3 | |||
Yang, Chunhua | Hubei, CN | 35 | 239 |
# of filed Patents : 35 Total Citations : 239 | |||
Yin, Zhengjie | Hubei, CN | 3 | 0 |
# of filed Patents : 3 Total Citations : 0 | |||
Zhao, Hanqing | Beijing, CN | 10 | 4 |
# of filed Patents : 10 Total Citations : 4 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- E02B Class
- 0 % this patent is cited more than
- 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Jul 9, 2027 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Jul 9, 2031 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jul 9, 2035 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
Date | Code | Event | Description |
---|---|---|---|
Jan 28, 2025 | AS | ASSIGNMENT | free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:TERRAPOWER, LLC;REEL/FRAME:070121/0297 Owner name: TERRAPOWER ISOTOPES, LLC, WASHINGTON Effective Date: Jan 28, 2025 |
Jun 04, 2024 | P | Publication | |
May 15, 2024 | STCF | INFORMATION ON STATUS: PATENT GRANT | free format text: PATENTED CASE |
Apr 25, 2024 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED |
Feb 15, 2024 | AS | ASSIGNMENT | free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:DUNCKLEY, CHRISTOPHER P.;REEL/FRAME:066995/0615 Owner name: TERRAPOWER, LLC, WASHINGTON Effective Date: Feb 15, 2024 |
Jan 22, 2024 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS |
Jan 16, 2024 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
Oct 12, 2023 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS |
Sep 29, 2022 | P | Published | |
Jun 21, 2022 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
Dec 30, 2021 | AS | ASSIGNMENT | free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:CZERWINSKI, KEN;WALTER, JOSHUA C.;SIGNING DATES FROM 20160303 TO 20160314;REEL/FRAME:058511/0808 Owner name: TERRAPOWER, LLC, WASHINGTON |
Nov 23, 2021 | F | Filing | |
Nov 23, 2021 | FEPP | FEE PAYMENT PROCEDURE | free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |

Matter Detail

Renewals Detail
