Electric propulsion system of an aircraft

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11866185
APP PUB NO 20220306306A1
SERIAL NO

17701818

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A propulsion system includes a system for producing electricity that supplies electricity to at least one electric motor to which is mechanically coupled a propeller situated near a first longitudinal end of a nacelle that houses at least the system for producing electricity and the at least one electric motor. An air circulation channel, which receives a heat exchanger provided to allow the system for producing electricity to be cooled, extends inside the nacelle from a first end of the air circulation channel situated at the first longitudinal end of the nacelle. A part of the air circulation channel that is contiguous with its first end is delimited by an outer surface of cylindrical shape that surrounds the longitudinal axis of the nacelle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AIRBUS OPERATIONS SAS316 ROUTE DE BAYONNE TOULOUSE 31060
AIRBUS SASBLAGNAC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Allias, Jean Francois Toulouse, FR 1 0
Alvarez, Franck Toulouse, FR 9 22
Bammer, Benedikt Taufkirchen, DE 8 13
Ciet, Olivier Toulouse, FR 2 0
Labarthe, Christophe Toulouse, FR 12 23
Latourelle, Fabien Toulouse, FR 2 0
Pome, Pascal Toulouse, FR 9 18
Raspati, Olivier Toulouse, FR 7 9
Roux, Anthony Toulouse, FR 6 13
Verseux, Olivier Toulouse, FR 10 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 9, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00