Assembly for securing an electrical external power supply connector

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11865949
APP PUB NO 20210316615A1
SERIAL NO

17264928

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An assembly secures a connector of an external power supply in a rail vehicle. The connector is enclosed by a housing and by a rotatably mounted flap. The flap and the housing each have a slot configured to receive a catch. The flap can have two positions: a first position, in which the flap covers the connector and thus prevents access to the connector, and a second position, in which access to the connector is possible. The flap supports a lock cylinder, which can be switched by a key into two states: in a first state, the key can be pulled out of the lock cylinder, and in a second state, the key is secured in the lock cylinder against removal. A catch is rotated into both slots or out of both slots by the lock cylinder.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS MOBILITY GMBHOTTO-HAHN-RING 6 81739 MÜNCHEN 81739

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Reissing, Norbert Regensburg, DE 2 0
Schwerin, Michael Graefenberg, DE 7 142
Zeltner, Marc Reichenschwand, DE 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 9, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00