Method of manufacturing a core product

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11865739
SERIAL NO

17399645

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There are provided a method for manufacturing a core product, a method for removing a residual resin, and device for removing a residual resin including: supplying a molten resin; placing a conveying jig on a collection unit by conveying the conveying jig from a resin supply device to the collection unit together with a core body; splitting the resin solidified in a resin forming region from the resin solidified inside a resin flow path by removing the core body from the conveying jig; forming the residual resin which is a residue of the solidified resin inside the resin flow path and acquiring the core product including the core body and solidified resin formed in the resin forming region; and dropping the residual resin from the resin flow path into the collection unit by causing an extrusion unit to abut against the residual resin from above.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUI HIGH-TEC INC10-1 KOMINE 2-CHOME YAHATANISHI-KU KITAKYUSHU-SHI FUKUOKA 807-8588

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amano, Katsumi Fukuoka, JP 38 386
Kotani, Shuhei Fukuoka, JP 2 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 9, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00