System and method for isolating and analyzing cells

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11865542
APP PUB NO 20230037836A1
SERIAL NO

17965495

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method, wherein the system includes: an array of wells defined at a substrate, each well including an open surface and a well cavity and a fluid delivery module including a fluid pathway through which fluid flow is controlled along a fluid path in a direction parallel to the broad face of the substrate; and wherein the method includes: generating a set of genetic complexes within individual wells of the array of wells.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BIO-RAD LABORATORIES INC1000 ALFRED NOBEL DRIVE HERCULES CA 94547

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Boniface, Brian Hercules, US 16 70
Chow, William Hercules, US 13 145
Connolly, John Hercules, US 27 540
Gleason, Kyle Hercules, US 35 452
Gogoi, Priyadarshini Hercules, US 52 765
Handique, Kalyan Hercules, US 234 15593
Payne, Austin Hercules, US 30 425
Sharma, Vishal Hercules, US 90 1598
Tuck, Sam Hercules, US 9 53

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 9, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00