Noble metal-promoted IN2O3 catalyst for the hydrogenation of CO2 to methanol

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11865519
APP PUB NO 20210354114A1
SERIAL NO

17273108

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Method to prepare a catalyst for use in a process for the synthesis of methanol, comprising indium oxide in the form of In2O3, and at least one additional metal selected from a noble metal; and in that the average particle size of said noble metal phase is, preferably at least 0.05 nm, and less than 5 nm as determined by STEM-EDX, characterized in that the catalyst is prepared by co-precipitation of a saline solution at a pH above 8.5 comprising an indium salt and a salt of the at least one additional metal selected from a noble metal and optionally further comprising a salt of the at least one alkaline earth metal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOTALENERGIES ONETECHLA DÉFENSE 6 2 PLACE JEAN MILLIER 92400 COURBEVOIE 92400

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Curulla-Ferre, Daniel Uccle, BE 15 13
Frei, Matthias Zürich, CH 7 36
Mondelli, Cecilia Zürich, CH 9 4
Perez-Ramirez, Javier Zürich, CH 70 278
Stewart, Joseph Uccle, BE 16 453

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 9, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00