Method and apparatus for sharing co-generated energy when processing essential elements from plant matter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11865473
SERIAL NO

17577189

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and apparatus consistent with the present disclosure may provide electrical energy and thermal to extraction or separation equipment. Methods and apparatus consistent with the present disclosure may extract and concentrate essential elements plant matter. An amount of wasted heat energy collected from a engine that powers an electrical generator may be provided to an evaporation or separation process when electrical power is provided to extraction or separation processing equipment. Computers or electronics that control equipment consistent with the present disclosure may be remotely controlled via a mobile electronic device, when desired. Such computers or electronics may receive sensor data related to the operation of plat matter extractors, related separation equipment, or other equipment may be used to manage a production line. As such, methods and apparatus consistent with the present disclosure may extract essential elements from cannabis plant matter and process those essential elements into cannabis extracts or isolates.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HOSPODOR ANDREW DAVIDSANTA CRUZ CA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hospodor, Andrew David Santa Cruz, US 12 156
Rapp, Robert James San Jose, US 11 85

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 9, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00