Optimization method for capacity of heat pump and power of various sets of energy source equipment in energy hub

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11862973
APP PUB NO 20210376605A1
SERIAL NO

17333510

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure discloses a method for optimizing equipment capacity and equipment power of an energy hub system. The method includes establishing an energy hub model containing natural gas boilers, electric boilers, coolers and heat pumps, establishing a bilevel optimized upper model to solve the optimal heat pump capacity, and establishing a bilevel optimized lower model to solve the optimal power utilization of each energy device based on the binary search algorithm of the quadratic function solves the upper model by using the multi-objective evolutionary algorithm NSGA-II to solve the lower model. The optimization method of the present invention can solve the multi-objective bilevel model problem without the help of commercial optimization software. Obtaining a reasonable, efficient and green planning scheme makes the total operating cost and total exhaust gas emissions of the energy hub relatively optimal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XIANGTAN UNIVERSITYXIANGTAN UNIVERSITY YANGGUTANG STREET YUHU DISTRICT XIANGTAN CITY HUNAN PROVINCE XIANGTAN CITY HUNAN PROVINCE 411105

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liu, Zhongbing Xiangtan, CN 1 1
Pei, Tingrui Xiangtan, CN 2 1
Yang, Xu Xiangtan, CN 170 618
Zheng, Jinhua Xiangtan, CN 9 3
Zou, Juan Xiangtan, CN 8 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00