Correcting component failures in ion implant semiconductor manufacturing tool

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11862493
APP PUB NO 20220301903A1
SERIAL NO

17827408

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method includes determining, based on sensor data, that one or more components of substrate processing equipment are within a pre-failure window that is after a normal operation window. Corresponding data points in the normal operation window are substantially stable along a first health index value. The corresponding data points in the pre-failure window increase from the first health index value to a peak at a second health index value. Responsive to the determining that the one or more components are within the pre-failure window, the method further includes causing performance of a corrective action associated with the one or more components of the substrate processing equipment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
APPLIED MATERIALS INC3050 BOWERS AVENUE SANTA CLARA CA 95054

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Didari, Sima San Jose, US 12 64
Liao, Tianqing Mountain View, US 5 34
Rajagopal, Harikrishnan Santa Clara, US 7 35

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00