Making an aluminum nitride heater

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11862366
APP PUB NO 20230154656A1
SERIAL NO

18096275

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of making a heater includes an aluminum nitride base having equal to or less than 1% impurities, particularly one embodiment having none of polybrominated biphenyl, polybrominated diphenyl ether, hexabromocyclododecane, polyvinyl chloride, chlorinated paraffin, phthalate, cadmium, hexavalent chromium, lead, and mercury. The base is fired in a heating unit before any layering. Thereafter, on a topside and backside of the base a conductor layer is layered and allowed to settle and dry before firing. Next, a resistive layer is layered on the base from a resistor paste such that the resistive layer connects to the conductor layer on the topside. The resistor paste is allowed to settle and dry and then the base with the conductor and resistor layers is fired. At least four layers of glass are layered next over the resistive layer, each instance thereof including layering a glass, drying the glass and firing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LEXMARK INTERNATIONAL INC740 WEST NEW CIRCLE ROAD LEXINGTON KY 40550

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aoki, Makoto Ishikawa, JP 185 3294
Smith, Jerry Wayne Irvine, US 51 385

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00