Thermally integrated process for the production of liquid fuels with a solid oxide electrolyzer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11859135
APP PUB NO 20230287274A1
SERIAL NO

18445018

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Production of fuels from low carbon electricity and from carbon dioxide by the use of a solid oxide electrolysis cell (SOEC) and Fischer-Tropsch is shown. Fischer-Tropsch is an exothermic reaction that can be used to produce steam. Steam produced from the Liquid Fuel Production (LFP) reactor system, where the Fischer-Tropsch reaction occurs, is used as feed to the SOEC. The higher temperature steam improves the efficiency of the overall electrolysis system. The integration of the LFP steam improves the efficiency of the electrolysis because the heat of vaporization for the liquid water does not have to be supplied by the electrolyzer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INFINIUM TECHNOLOGY LLCSACRAMENTO CA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bucher, James Boston, US 13 7
Galloway, Anja Rumplecker San Rafael, US 18 3
Schuetzle, Dennis Grass Valley, US 68 243
Schuetzle, Robert Sacramento, US 72 119

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00