High efficiency plasma creation system and method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11856683
APP PUB NO 20230128652A1
SERIAL NO

17773819

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A chamber cross-sectional multi-stage plasma arrangement characterized by escalating charge movement towards chamber center axis through one or more escalation stages contributing to the heating of the plasma, the centering of the plasma on the chamber axis, and creating rotation of the plasma therein. Rotation of the plasma around its axis induces a self-generated magnetic field, which in turn increases plasma stability and confinement. Some of the said stages of the multi-stage arrangement may be created by physical elements and components while others may be induced or generated by externally applying magnetic and/or electric fields or their combinations and/or by injection of electrons, ions or other plasma.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
N T TAO LTDTEL AVIV

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gour, Lavie Oded Ein Iron, IL 2 1
Weinfeld, Boaz Jerusalem, IL 9 71
Weinfeld, Doron Jerusalem, IL 5 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00