Power generation element

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11855579
SERIAL NO

17399478

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment, a power generation element includes a first conductive region including a first surface, a plurality of second conductive regions, and a plurality of insulating structure regions. The second conductive regions are arranged along the first surface. A gap is provided between the second conductive regions and the first surface. One of the structure regions is provided between one of the second conductive regions and the first surface. An other one of the structure regions is provided between an other one of the second conductive regions and the first surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA TOSHIBAMINATO-KU TOKYO 105-8001
TOSHIBA ENERGY SYSTEMS & SOLUTIONS CORPORATION72-34 HORIKAWA-CHO SAIWAI-KU KAWASAKI-SHI KANAGAWA

International Classification(s)

  • No Non-US Classification to display

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hoshi, Takeshi Yokohama, JP 21 396
Kimura, Shigeya Yokohama, JP 82 494
Miyazaki, Hisao Yokohama, JP 36 71
Shimizu, Tatsuo Shinagawa, JP 299 2391
Tomita, Hiroshi Yokohama, JP 319 4120
Ueno, Souichi Ota, JP 9 9
Yoshida, Hisashi Kawasaki, JP 110 1029

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • No Patent Citation Ranking to display

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00