Material testing machine and method of controlling material testing machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11852614
SERIAL NO

17297455

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a material testing machine (1) including: a load mechanism (12) that applies a load to a test object; a load measurement device that measures the load applied to the test object; and a control device (30) that performs a feedback control for the load mechanism (12) based on a deviation between a measurement value of the load and a target value of the load, in which a change in a physical quantity generated in the test object due to the load is measured, and the control device (30) includes a hunting detection unit (66) that detects hunting by comparing a frequency spectrum obtained by converting time-series data of the measurement value with a frequency spectrum obtained by converting the time-series data of the target value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHIMADZU CORPORATIONKYOTO-SHI KYOTO 604-8511

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsuura, Tohru Kyoto, JP 28 125

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00