Displacement control device for seismic events

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11852291
APP PUB NO 20230265961A1
SERIAL NO

17678434

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A support platform is configured to support at least a portion of the weight of an associated semiconductor manufacturing tool, such as a furnace, when the associated semiconductor manufacturing tool is disposed on the support platform. The support platform comprises a base, a support plate disposed on the base and configured to move respective to the base, a brake plate arranged in fixed position respective to the base, and a damper secured to one of the support plate or the brake plate and frictionally engaging a track of the other of the support plate or the brake plate. The track includes a central track portion and inclined track portions extending away from the central track portion on respective first and opposite second sides of the central track portion. The inclined track portions are each inclined with respect to the central track portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY LTDNO 8 LI-HSIN ROAD 6 HSIN-CHU 300-77

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chiang, Chuan-Chieh Hsinchu, TW 2 0
Hsu, Chun-Jung Hsinchu, TW 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00