Reverse flow reactor regeneration using high heat capacity fluids

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11851328
APP PUB NO 20200317515A1
SERIAL NO

16838399

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods are provided for using a high heat capacity gas as at least a portion of the diluent during the regeneration step of a reverse flow reactor process. Instead of using nitrogen or air as the primary diluent gas, CO2 and/or H2O can be added as diluent gas for the regeneration step in the reaction cycle. Increasing the heat capacity of the diluent gas provides a reduction in the peak temperature within the reactor relative to the amount of fuel combusted during regeneration. This can allow for a reduction in the volume of diluent used during regeneration and/or an increase in the amount of fuel used. Reducing the volume of diluent can reduce the pressure drop during regeneration, which can provide a corresponding reduction in the amount of compression required for recycle of the diluent. Increasing the amount of fuel can allow for a corresponding increase in the amount of endothermic reaction performed during the reaction step.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EXXONMOBIL TECHNOLOGY AND ENGINEERING COMPANYANNANDALE NJ

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
O'Neal, Everett J Asbury, US 38 8
Skoulidas, Anastasios I Pittstown, US 21 87
Wang, Zhiyan The Woodlands, US 9 93

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00