Method for manufacturing engine poppet valve

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11850690
APP PUB NO 20230017343A1
SERIAL NO

17936389

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing an engine poppet valve comprising a valve head portion manufacturing operation in which hot forging is employed to form a stem/head intermediate product; a stepped stem portion manufacturing operation in which cold drawing is employed to cause a stepped stem portion comprising a first stem portion which has been made to be of decreased diameter, a step portion which has been formed by a stem member inlet surface, and a second stem portion in which there is absence of decrease in diameter and which is continuous by way of the step portion with the first stem portion to be formed from an intermediate stem portion; and a joining operation in which a stem end portion having a same outside diameter as the first stem portion is joined to a base end portion of the first stem portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NITTAN CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sasagawa, Yuki Hiratsuka, JP 3 9
Sato, Daiki Hadano, JP 46 147
Yoshino, Ryoichi Ninomiya-machi, JP 4 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jun 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00